Research & Analysis
Wei Gang, Feng Zhiyu, Su Dapeng, Liu Wei
2014, 28(3): 173-177.
An introduction is being presented to the equipment and system of a 3 102 t/h boiler, together with a description to the thermal deviation existing in its superheater under different conditions of steam temperature, metallic wall temperature of heating surface, and water consumption of attemperator at various stages of superheater. Causes leading to the thermal deviation were analyzed, while retrofit suggestions put forward from such aspects as the combustion mode of boiler, heating surface arrangement of superheater, pipeline arrangement at superheater outlet, and so on. Practices indicate that the total temperature rise deviation of all branches has been reduced from 39.2 K to 14.6 K after retrofit.